Process

From Design to On-Site Assembly

Follow the EcoNest building process: design confirmation, factory production, ocean shipping and on-site assembly.

Design Sign-Off

Finalize the layout, exterior finishes, and project requirements before production begins.

Style C VIP suite layout with seating, covered terrace, and dimension annotations

Factory Production

30 days

From design sign-off and order confirmation to production completion.

Components are manufactured to the approved plans and prepared for shipping.

Factory workers preparing building panels and frames on the production floor

Packing & Ocean Shipping

30–50 days

Packed at the factory, then in ocean transit to your destination port.

Components are securely packed and loaded into shipping containers. Transit time varies by destination.

Workers applying protective packaging to a building component at the factory
Protective packing.
Forklifts loading a protected building component into a shipping container
Container loading.

On-Site Assembly

10–15 days

Prefabricated components are assembled on site to form the VIP suite.

Installation crew working beside Style C VIP suites at a stadium

Timelines are estimates for this Style C VIP suite example. Actual schedules vary by destination, project scope, and site conditions.

Explore Style C
  1. Assembly crew positioning the steel floor frame on the prepared site

    Main Framework Assembly

    Position and assemble the main framework to the project-specific engineering package.

  2. Two workers lifting a prefabricated gable wall panel onto the steel floor frame

    Wall Panels, Doors & Windows

    Fit the coordinated wall panels, openings, doors and windows.

  3. Roof framing and membrane being fixed over the panelised walls

    Roof Panel Installation

    Install the selected roof-panel package on the prepared structure.

  4. Worker on a ladder finishing the roof edge and ceiling line

    Flooring, Ceilings & Finishes

    Complete flooring, ceiling and finish work within the agreed scope.

  5. Completed EcoNest building with its deck and covered porch, ready for handover

    Utility Connections & Final Commissioning

    Finalize utility hookups and system checks.

Explore Style BL

Performance You Can Specify

Factory-controlled production, documented stage by stage. These are the figures our engineering and production teams work to.

  • ≤2mm

    Factory production tolerance

    Precision Manufacturing. Factory-controlled production ensures sub-millimeter accuracy for superior structural integrity.

  • 90%

    Built in the factory

    Built Off-Site. Maximizing factory prefabrication to minimize site disruption and environmental impact.

  • 100+units/month

    Production capability

    Scalable Production. High-capacity manufacturing ready to fulfill large-scale project demands on time.

  • 80%

    Reduced installation time

    Faster Installation. Dramatically reduced on-site construction time compared to traditional building methods.

  • 60%

    Reduced installation cost

    Reduced Labor Costs. Streamlined assembly processes require fewer trades and less on-site labor.

  • 50%

    Reduced material waste

    Less Waste. Optimized material usage in a controlled factory setting significantly reduces construction waste.

  • 95%

    Material recyclability

    Recyclable Materials. Engineered with sustainability in mind, utilizing highly recyclable components for a greener future.

  • 90+%

    Reusable across the building’s lifespan

    Designed to Be Reused. Components are engineered to be recovered and redeployed across the building’s service life.

  • 6mm

    Optional photovoltaic glass thickness

    Integrated Solar Glass. Optional photovoltaic glazing turns roof area into on-site energy generation without added structure.

  • 1600 × 1200mm

    Optional glass maximum panel size

    Large-Format Glazing. Generous panel dimensions mean fewer joints, cleaner rooflines, and faster installation.

Figures reflect documented EcoNest factory production and completed project records. Schedules remain project-specific and may vary by model, destination, site conditions, logistics, and local approval requirements.

Included as Standard

Metal roof standard. BIPV glass roofing and battery storage optional.

  • Electrical Wiring
  • Plumbing
  • Windows & Exterior Doors
  • Floor Finishes
  • Ceilings & Drywall
  • LED Lighting
  • Shower Enclosure (Does not include Series-C)
  • Toilet (Does not include Series-C)
Explore Models